Gas Distribution Line Replacement
From 29 June 2025 to 20 July 2025, leakage repair and replacement works were carried out on the 3" gas distribution line at Barodeshi Village, Aminbazar.
The project involved the replacement of a 3" × 360-foot gas distribution pipeline, positioned at a depth of 27 feet below ground level. All works were executed under the supervision of Titas Gas Transmission and Distribution PLC. The replacement and restoration works were successfully completed within the scheduled period.
Project Location
Barodeshi Village, Aminbazar, Savar.
Project Type
Gas Distribution Line Replacement
Project Cost
Confidential
Client
Titas Gas Transmission and Distribution PLC