We provide gas line load extension services to accommodate increased industrial demand or new infrastructure. Engineers evaluate existing pipelines, design optimal extensions, and install additional lines while maintaining safety and pressure standards, followed by comprehensive testing and verification.

Gas Pipeline Load Extension

Steps We Follow:

1

Load Requirement Analysis

Engineers evaluate current pipeline capacity and calculate additional load requirements for new industrial equipment or infrastructure.

2

Design & Regulatory Approval

An optimized extension design is created and reviewed to meet regulatory and safety standards.

3

Pipeline Extension Installation

New lines are integrated with existing infrastructure, ensuring proper alignment, pressure, and safety compliance.

4

System Testing

Pressure, flow, and leak tests are performed to confirm safe operation at increased capacity.

5

Handover & Documentation

Certification and technical documentation are provided, confirming the upgraded system is ready for continuous industrial use.